VOKERA Linea Manuel de service

Naviguer en ligne ou télécharger Manuel de service pour Chauffe-eau et chaudières VOKERA Linea. VOKERA Linea Technical data Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 64
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
The Range
Linea 24
Linea 28
Installation
& Servicing
Instructions
British Gas Service Listed
G.C. No. 47 094 27 (Linea 24)
G.C. No. 47 094 28 (Linea 28)
G.C. No. 47 094 29 (Linea Plus)
THESE INSTRUCTIONS
TO BE RETAINED
BY USER
Vue de la page 0
1 2 3 4 5 6 ... 63 64

Résumé du contenu

Page 1 - The Range

The RangeLinea 24 ● Linea 28Installation& ServicingInstructionsBritish Gas Service ListedG.C. No. 47 094 27 (Linea 24)G.C. No. 47 094 28 (Linea

Page 2

8Linea 24 & 284.6.6 Air Release PointsThese must be fitted at all high points whereair will naturally collect, and must be sited tofacilitate comp

Page 3 - SECTION 1 INTRODUCTION

Linea 24 & 289SECTION 5 INSTALLATION5.1 Delivery (fig. 8)The appliance is delivered in a heavy dutycardboard carton.Lay the carton on the f

Page 4

10Linea 24 & 285.4Mounting the applianceThe appliance should be mounted on a smooth,vertical surface, which must be capable ofsupporting the full

Page 5 - SECTION 3 TECHNICAL DATA

Linea 24 & 2811FITTING THE STANDARD (2359029) HORIZONTALFLUE KIT (see 5.4.1)Carefully measure the distance from the centre of theappliance flue ou

Page 6

12Linea 24 & 28Using the dimensions given in fig. 14 as a reference,mark and cut a 105mm hole in the ceiling and/or roof.Fit the appropriate flash

Page 7

Linea 24 & 2813Mounting the boilerThe fixing holes for the wall-mounting bracket& jig should now be drilled and plugged, anappropriate type an

Page 8

14Linea 24 & 28NOTE• Before cutting twin flue pipes ensureallowances have been made for connectiononto the previous piece and onto theconcentric t

Page 9

Linea 24 & 28155.6 Connecting the Gas and Water5.6.1 Figs. 6 and 16 show the locations of thefittings.5.6.2 Do not over tighten nuts, use another

Page 10

16Linea 24 & 285.7.4 Pass the cable through one of the cord an-chorage points and connect the wires Brownto L, Blue to N, and Green/Yellow to. Arr

Page 11 - SECTION 5 INSTALLATION

Linea 24 & 2817SECTION 6 COMMISSIONING6.1 Where the text bears identifying numbers inbrackets, refer to figs. 1 and 2 unless other-wise instr

Page 12

Linea 24 & 28 CONTENTSSection Subject Page noSection 1 Introduction 1General Layout 1Section 2 Design Principles & OperatingPrinciples 2Schema

Page 13

18Linea 24 & 286.5.5 If during the ignition attempt period (10 secsapprox.) the boiler fails to light, the ignitioncontrol circuit will go to lock

Page 14

Linea 24 & 28196.6.8 Setting the Maximum Rate for Central Heat-ingThe maximum heat input for the central heat-ing mode is not adjustable. When ce

Page 15

20Linea 24 & 286.12 Final Check for OperationsTurn mode selector switch to the OFF/RESETposition, disconnect pressure gauge, re-tightenscrew. Reli

Page 16

Linea 24 & 2821SECTION 8 SERVICING INSTRUCTIONS8.1 GeneralTo ensure the continued safe and efficientoperation of the appliance, it is recommen

Page 17

22Linea 24 & 288.4 To Gain General Access/AssemblyTo remove components access to the interioris essential. Refer to figs. 10 & 11.Ensure elect

Page 18

Linea 24 & 28238.6 Main Burner and ElectrodesPart No'sSense Electrode - 24&28 - 2092Refer to figs. 27,28 & 298.6.1 Gain general acces

Page 19 - SECTION 6 COMMISSIONING

24Linea 24 & 288.9 Flue FanPart No. 24-5910 28-59118.9.1 Remove room sealed front cover plate (8.5)and front of combustion chamber (8.6.3).8.9.2

Page 20 - Gas Valve

Linea 24 & 28258.12 Ignition PCB8.12.1 Gain general access as 8.4.8.12.2 Remove PCB cover.8.12.3 Disconnect wires from ignition PCB.8.12.4 Remove

Page 21

26Linea 24 & 288.14 PumpPart No 10020437 See fig. 338.14.1 Gain general access as 8.48.14.2 Close heating flow and return valves (fig. 6),by turni

Page 22

Linea 24 & 28278.17 Removal of Domestic Hot Water HeatExchangerRefer to figs. 34 and 358.17.1 Gain General access 8.48.17.2 Place receptacle or an

Page 23

Linea 24 & 281These appliances are designed for use with asealed heating system only and are not in-tended for use on an open vented system.The pr

Page 24

28Linea 24 & 288.20 Safety ValvePart No. 1806 Refer to figs.34 & 358.20.1 Gain general access as 8.4.8.20.2 Close heating flow and return valv

Page 25

Linea 24 & 28298.21.7 Motorised Valve8.21.8 Gain general access as 8.48.21.9 Release motorised valve by removing retain-ing clip.8.21.10 Remove el

Page 26

30Linea 24 & 288.23 Setting Gas PressuresALL SETTINGS DONE WITH A SUITABLEMANOMETER CONNECTED TO GASVALVE AS INSTRUCTED IN 6.6.58.23.1 Setting Max

Page 27

Linea 24 & 28318.24 Soft Light IgnitionThe Linea range incorporates a fully auto-matic soft light ignition sequence which is nonadjustable.When ig

Page 28

32Linea 24 & 28If a flame is detected during the ignition at-tempt time (8-12 seconds) the sparking willcease, the gas valve will remain energised

Page 29

Linea 24 & 28339.2.3 Central Heating ModeIn this mode the mode selector switch must beturned to the position.With all controls calling for heat

Page 30

34Linea 24 & 28MAINS ON FANREPLACE FANREPLACEWIRING ORCONNECTIONS230V ON PUMPREPLACE PUMPA2AISTHERE 0 VDCBETWEEN TERMINALS M5.5 & M5.6 ON

Page 31 - Safety Thermostat

Linea 24 & 2835CHECK WIRING ANDCONNECTIONS,HIGH LIMITTHERMOSTAT ORPCBA1DOES THE PRESSUREDIFFERENTIAL SWITCHOPERATECHECK WIRINGANDCONNECTIONSISTHER

Page 32

36Linea 24 & 28A2REPLACE PCBFUSE OKCHECK FUSES F1AND F2 ON PCBRECHECKSUPPLY FUSE& CONNECTORSTO BOILERTERMINALSIS THELED FLASHINGREDREPLACE TH

Page 33 - LED 1 to 4

Linea 24 & 2837ISVOLTAGE ACROSSTERMINALS OFMODULATOR COIL >10 VDCREPLACE GASVALVECOMPLETEREPLACE WIREANDCONNECTIONSREPLACECONTROLBOARDREPL

Page 34

2Linea 24 & 28SECTION 2 DESIGN PRINCIPLES AND OPERATING SEQUENCE2.1 Fig.1 illustrates the general layout of compo-nents. Fig.2 illustrates the op

Page 35 - FAULT FINDING GUIDES

38Linea 24 & 28REPLACE PCBREMOVEJUMPER JP8 ONPCBIS TIMER JUMPERON JP8 ON PCBISVOLTAGE ACROSS TERMINALS OFMODULATOR COIL >10 VDCISVOLTAGE A

Page 36 - Linea 24 & 28

Linea 24 & 28390 VDC ON PRESSURESWITCHCHECKTHE WATERPRESSURESWITCHOK YESYESELECTRONICIGNITION BOX OKYESISTHERE 24 VDCBETWEEN TERMINALSM3.5 &

Page 37

40Linea 24 & 28A4REPLACE PCBREPLACE PCBCHECK DHWNTC SENSOR ORCONNECTIONDIGITALDISPLAY SHOWING03 DIGITALDISPLAY SHOWING04DIGITAL DISPLAYSHOWING 06D

Page 38

Linea 24 & 2841REPLACE PCBREPLACE DHWNTCIS DHW NTC OKREPLACE DHWFLOW SWITCHIS DHW FLOWSWITCH OKENDDO BURNER, FAN AND PUMPSWITCH OFFDOES FAN RUNI

Page 39

42Linea 24 & 28C1ISWATER FLOWTEMPERATURE >80 *˚CWAIT FOR WATERFLOWTEMPERATURE TO BE< 80*˚CREPLACE PCBDO BURNER AND FANSWITCH ONREMOVE T

Page 40

Linea 24 & 2843REPLACE PCBWAIT 3 MIN.WAIT 1 MIN.CISVOLTAGE ACROSS TERMINALS OFMODULATOR COIL >10 VDC SWITCH CHTHERMOSTAT TOMIN.DOBURNER

Page 41

44Linea 24 & 28SECTION 10 APPENDIXA. Installation of the Vokèra time switches (24 Hr and 7 Day)Remove printed circuit board cover (5 screws).Rem

Page 42

Linea 24 & 2845DO NOT USE SMALLER TERMINALBLOCK MARKED 'POS' 'POS' '-''S' WHENCONNECTING INTERNAL OR EXTE

Page 43

46Linea 24 & 28B. Wiring to External Time Switches and Thermostats.(i) General Schematic Diagram.Earths have beenomitted for clarityTo ease wiring

Page 44

Linea 24 & 2847MODE SELECTOR SWITCH MUST BE IN THE POSITION.To ease wiring conjestion at the appliance terminal strip, remove the

Page 45

Linea 24 & 283SECTION 3 TECHNICAL DATA3.1 Units Dimensions and values are given in thepreferred Sl Units with Imperial units in brack-ets where ap

Page 46 - Vokera room

48Linea 24 & 28EXPLODED DIAGRAMS446913151617202122252627282930313233343641444546475152434211450KEY DESCRIPTION 24 281 Frame 01005133 010051346 Gua

Page 47

Linea 24 & 284913222416302830283234323432345236141312 111078179KEY DESCRIPTION 24 281 Expansion vessel 2204 22042 Flexible pipe 2164 21643 Heating

Page 48

50Linea 24 & 2844121043111820273938323143302829161345174545266541923844443144271143154444922212333245051KEY DESCRIPTION 24 281 Heat exchanger 2381

Page 49

Linea 24 & 28511891034511131914191617292628323372522256125051KEY DESCRIPTION 24 281 Air box bottom 2072 20732 Ambidx air box side 1549 15494 NG Bu

Page 50 - EXPLODED DIAGRAMS

52Linea 24 & 2867814121741920232425302755051KEY DESCRIPTION 24 284 Pressure differential switch 8195 81955 Silicone tube 1457 14576 Brass cap 8086

Page 51 - KEY DESCRIPTION 24 28

Linea 24 & 2853ABLING AND DISABLING ELECTRONIC FUNCTIONSCertain electronic functions on the Linea rangeof appliances can be abled or disabled ac-c

Page 52

54Linea 24 & 28FUNCTIONAL FLOW DIAGRAMNOTE: L-N-E CONNECTION IS ADVISABLEKeyRT Room thermostatTSH Heat time switchSFS Domestic hot water flow swit

Page 53

Linea 24 & 2855GENERAL LAYOUT & ILLUSTRATED WIRING DIAGRAMFig. 41NOTE: L-N-E CONNECTION IS ADVISABLECONTROL SWITCHING OF TIME CLOCK AND ROOM T

Page 54

56Linea 24 & 28PRELIMINARY ELECTRICAL SYSTEM CHECKSA. EARTH CONTINUITY CHECK - appliance must beelectrically disconnected - meter set on Ω (ohms

Page 55

Linea 24 & 2857SECTION 11 L.P.G. INSTRUCTIONSMin. Gas RateMax. Gas RateBurner Pressure Max. RateMain Burner InjectorsMain BurnerBurner Pressure

Page 56 - FUNCTIONAL FLOW DIAGRAM

4Linea 24 & 28Central Heating output rangeMax. 28.0 kW (95,563 Btu/h)Min. 9.9 kW (33,788 Btu/h)Designed temp rise 20°CMax. flow temperature 85°CNo

Page 57

58Linea 24 & 2811.6.6 Reduce the domestic water flow rate to ap-proximately 3-4 litres/min. Turn the domesticcontrol knob slowly to minimum the bo

Page 58

Linea 24 & 28

Page 59

Linea 24 & 28

Page 60

Linea 24 & 28

Page 61

Cod. 10023216 - 21/02 - Ed. 3Vokèra Ltd.Catherine House, Boundary Way, Hemel Hempstead, Herts, HP2 7RPEmail: [email protected] Web: www.vokera.co

Page 62

Linea 24 & 285SECTION 4 GENERAL REQUIREMENTS4.0 General RequirementsThis appliance must be installed by a compe-tent person in accordance with

Page 63

6Linea 24 & 28For protection of combustibles, refer to BS5440:1 where the terminal is less than 2m(6.6ft) above a pavement or platform to whichpeo

Page 64 - A Riello Group Company

Linea 24 & 287N.B. Vokèra Ltd recommend a 2-pipe system. Single pipe systems are more liable to be troublesome unlesscarefullly designed and insta

Commentaires sur ces manuels

Pas de commentaire